<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
<title>SIS Automation (English)</title>
<link>https://sis-automation.de/</link>
<description>Blog and knowledge articles from SIS Automation GmbH.</description>
<language>en-us</language>
<lastBuildDate>Sat, 31 Oct 2026 00:00:00 GMT</lastBuildDate>
<item>
<title>Project process and commissioning</title>
<link>https://sis-automation.de/en/knowledge/commissioning-fat-sat-handover.html</link>
<guid isPermaLink="true">https://sis-automation.de/en/knowledge/commissioning-fat-sat-handover.html</guid>
<pubDate>Sun, 25 Oct 2026 00:00:00 GMT</pubDate>
<description>At SIS Automation every project runs in four phases: initial consultation, engineering, control cabinet build and commissioning. Handover includes documentation, instruction and 12 months of warranty. There is one point of contact from planning to handover.</description>
</item>
<item>
<title>Control cabinet build and VDE testing</title>
<link>https://sis-automation.de/en/knowledge/control-cabinet-build-vde-testing.html</link>
<guid isPermaLink="true">https://sis-automation.de/en/knowledge/control-cabinet-build-vde-testing.html</guid>
<pubDate>Sun, 25 Oct 2026 00:00:00 GMT</pubDate>
<description>SIS Automation takes over assembly, wiring and testing of control and distribution cabinets per your documents. Manufacturing is done by qualified partner workshops; responsibility, quality control and final inspection stay with SIS Automation. Every control cabinet undergoes a VDE test to VDE 0113 (controls for machines) and VDE 0100 (heavy-current installations) before delivery.</description>
</item>
<item>
<title>KNX SmartHome with Home Assistant: planning</title>
<link>https://sis-automation.de/en/knowledge/knx-smarthome-home-assistant.html</link>
<guid isPermaLink="true">https://sis-automation.de/en/knowledge/knx-smarthome-home-assistant.html</guid>
<pubDate>Sun, 25 Oct 2026 00:00:00 GMT</pubDate>
<description>KNX is an open, manufacturer-independent bus protocol for building automation — not a proprietary system that the manufacturer can discontinue at short notice. Home Assistant runs locally on your own hardware, without a cloud connection — your home data does not leave the building.</description>
</item>
<item>
<title>Integrating a KUKA robot cell: KRC4/KRC5</title>
<link>https://sis-automation.de/en/knowledge/kuka-robot-cell-integration-krc4-krc5.html</link>
<guid isPermaLink="true">https://sis-automation.de/en/knowledge/kuka-robot-cell-integration-krc4-krc5.html</guid>
<pubDate>Sun, 25 Oct 2026 00:00:00 GMT</pubDate>
<description>SIS Automation GmbH programs, integrates and commissions KUKA robot cells. We work with both current KUKA controller generations: KRC4 and KRC5. Whether it is a new plant or an extension of an existing cell — we connect the robot to your controller, the safety technology and the peripherals and hand over a fully running plant, not a parts list.</description>
</item>
<item>
<title>Migrating S7 Classic to TIA Portal</title>
<link>https://sis-automation.de/en/knowledge/s7-classic-to-tia-portal-migration.html</link>
<guid isPermaLink="true">https://sis-automation.de/en/knowledge/s7-classic-to-tia-portal-migration.html</guid>
<pubDate>Sun, 25 Oct 2026 00:00:00 GMT</pubDate>
<description>Older S7 Classic controllers increasingly lose spare-parts supply and manufacturer support. Switching to TIA Portal therefore does not have to mean a long production stop. SIS analyses the legacy program, ports the logic to TIA Portal and commissions step by step — out of operation as briefly as possible, tested as thoroughly as necessary.</description>
</item>
</channel>
</rss>
